- Non-automated control systems
- Aging infrastructure and deferred maintenance
Water Practice Case Study
Wastewater Plant in South Central Arizona
Outcomes
$
0
Total Cost Savings Identified
0
Proposed Savings (kWh)
0
Proposed Savings (kW)
Main Problems
Overview
Plant Type
Activated Sludge
Plant Size (MGD)
203
AESC coordinated, prepared for, and participated in an on-site launch meeting with this agency’s senior staff. AESC supported the delivery of five full-day group workshops and subsequent half-day group workshops focused on the wastewater sites and provided specialized technical coaching during breakout sessions of the workshops. AESC also identified energy and operational cost savings opportunities, along with capital projects that would enable high energy savings and low Simple Payback Period (SPP) energy efficiency opportunities with implementation methodologies.